Elements and Performance Criteria
- Prepare for dynamometer operation
- Job requirements are determined from team instructions, category regulations and manufacturer procedures
- Dynamometer is checked for calibration and serviceability, and is prepared for operation according to manufacturer specifications and team procedures
- Hazards associated with the work are identified and risks are managed according to safety requirements
- Tools and equipment for securing dampers are selected and checked for serviceability
- Conduct dynamometer testing
- Appropriate load and run sequence and test parameters are determined
- Dampers are connected and secured to dynamometer according to manufacturer specifications and team procedures
- Selected dynamometer testing sequence is carried out according to manufacturer and team procedures and safety requirements, and results are documented
- Dynamometer test data is analysed and conclusions are drawn about damper condition and performance according to manufacturer specifications and team procedures
- Findings are reported to appropriate personnel, including recommendations based on dynamometer data for damper configuration or modifications to improve performance, according to team procedures
- Damper modifications are carried out and tested on dynamometer according to manufacturer specifications, team procedures and safety requirements as required
- Data is presented to team members according to team procedures
- Complete work processes
- Dynamometer shutdown procedure is carried out according to manufacturer specifications, team procedures and safety requirements
- Dampers are disconnected from dynamometer according to manufacturer specifications and team procedures
- Dynamometer, tools and associated equipment are checked, maintained and stored according to workplace procedures
- Dynamometer test results are documented and stored according to team procedures to create or add to damper history
- Prepare for dynamometer operation
- Job requirements are determined from team instructions, category regulations and manufacturer procedures
- Dynamometer is checked for calibration and serviceability, and is prepared for operation according to manufacturer specifications and team procedures
- Hazards associated with the work are identified and risks are managed according to safety requirements
- Tools and equipment for securing dampers are selected and checked for serviceability
- Conduct dynamometer testing
- Appropriate load and run sequence and test parameters are determined
- Dampers are connected and secured to dynamometer according to manufacturer specifications and team procedures
- Selected dynamometer testing sequence is carried out according to manufacturer and team procedures and safety requirements, and results are documented
- Dynamometer test data is analysed and conclusions are drawn about damper condition and performance according to manufacturer specifications and team procedures
- Findings are reported to appropriate personnel, including recommendations based on dynamometer data for damper configuration or modifications to improve performance, according to team procedures
- Damper modifications are carried out and tested on dynamometer according to manufacturer specifications, team procedures and safety requirements as required
- Data is presented to team members according to team procedures
- Complete work processes
- Dynamometer shutdown procedure is carried out according to manufacturer specifications, team procedures and safety requirements
- Dampers are disconnected from dynamometer according to manufacturer specifications and team procedures
- Dynamometer, tools and associated equipment are checked, maintained and stored according to workplace procedures
- Dynamometer test results are documented and stored according to team procedures to create or add to damper history