Elements and Performance Criteria
- Prepare to install LPG/ CNG electrical control equipment
- Nature and scope of work requirements are identified and confirmed
- OH&S requirements, including individual State/Territory regulatory requirements and personal protection needs are observed throughout the work
- Procedures and information such as workshop manuals and specifications, and tooling, are sourced
- Method options are analysed and those most appropriate to the circumstances are selected and prepared
- Technical and/or calibration requirements for installation are sourced and support equipment is identified and prepared
- Warnings in relation to working with gas systems are observed
- Carry out installation
- Conduct tests and analyse results
- Methods for system tests are implemented in accordance with workplace procedures and manufacturer/component supplier specifications
- Test results are compared with manufacturer/component supplier specifications to indicate compliance or non-compliance
- Results are documented with evidence and supporting information and recommendation(s) made
- Report is processed in accordance with workplace procedures
- Prepare vehicle for use or storage