Elements and Performance Criteria
- Prepare to install LPG fuel systems
- Nature and scope of work requirements are identified and confirmed
- OH&S requirements, including State/Territory regulatory requirements and personal protection needs are observed throughout the work
- Procedures and information such as workshop manuals and specifications, and tooling are sourced
- Method options are analysed and those most appropriate to the circumstances are selected and prepared
- Technical and/or calibration requirements for installation of the systems are sourced and support equipment is identified and prepared
- Warnings in relation to working with LPG fuel systems are observed
- Carry out installation
- Prepare vehicle for use or storage
- Installation documentation is completed
- Final inspection is made to ensure safety features are in place
- Final inspection is made to ensure work is to workplace expectations
- The vehicle is cleaned for use or storage to workplace expectations
- Job card is processed in accordance with workplace procedures