Google Links

Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Prepare to install CNG fuel system
  2. Carry out installation activities
  3. Complete work processes
  4. Prepare to install CNG fuel system
  5. Carry out installation activities
  6. Complete work processes

Range Statement

This section specifies work environments and conditions that may affect performance. Essential operating conditions that may be present (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) are included. Bold italicised wording, if used in the performance criteria, is detailed below.

CNG fuel system components must include:

fill valve and fill hose

fuel container and mounting

service line

vaporiser

regulator

safety lock-off devices

mixers or injectors

associated electrical and electronic system, including selector and safety switches

compliance plates.

Safety and environmental requirements must include:

work health and safety (WHS) and occupational health and safety (OHS) requirements, including procedures for working with extremely cold and flammable gas

environmental requirements, including procedures for preventing loss of gas to atmosphere.

Testing CNG fuel system must include:

system leak testing

exhaust gas analysis to ensure compliance with relevant emission control standards.



Knowledge Evidence

Individuals must be able to demonstrate knowledge of:

work health and safety (WHS) and occupational health and safety (OHS) requirements relating to installing CNG fuel systems, including procedures for working with extremely cold and flammable gas

environmental requirements, including procedures for preventing loss of gas to atmosphere

requirements of AS/NZS 2739 Natural gas (NG) fuel systems, including:

containers and fuel system components

fuel service lines and materials

fuel control equipment

Australian standard inspection, testing and commissioning requirements

CNG system adjustment procedures, including exhaust gas analysis

Australian standard certification, compliance plate, and marking and label requirements.