Google Links

Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Deploy aerobridge
  2. Pre-position aerobridge
  3. Aerobridge console is operated in accordance with workplace procedures and manufacturer instructions
  4. Appropriate safety checks are made to ensure roll-door is down and apron is clear in accordance with workplace procedures and regulatory requirements
  5. Floodlights are employed during low-visibility operations in accordance with workplace procedures
  6. Aerobridge is pre-positioned for aircraft type in accordance with workplace procedures and manufacturer instructions
  7. Roll-door is secured and closed in readiness for aircraft arrival in accordance with regulatory requirements
  8. Aerobridge movement is monitored and controlled through docking procedure
  9. Aerobridge is placed on auto level in accordance with manufacturer instructions
  10. Aerobridge roll-door and aircraft door are opened and safety shoe positioned in accordance with workplace procedures and regulatory requirements
  11. Retract and stow aerobridge
  12. Aerobridge is retracted from aircraft to minimum safety distance using aerobridge console in accordance with manufacturer instructions and workplace procedures
  13. Canopy is retracted, lowered and locked into position in accordance with workplace procedures and manufacturer instructions
  14. Aerobridge pre-position function is selected and aerobridge returned to PARK position after aircraft departure
  15. Roll-door is closed and secured in accordance with regulatory requirements
  16. Aerobridge console is deactivated and power isolated in accordance with manufacturer instructions and workplace procedures