Google Links

Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Prepare for approach
  2. Conduct an approach
  3. Navigation system validity check is conducted as required
  4. Receiver autonomous integrity monitoring (RAIM) check is conducted as required
  5. Flight plan is selected, loaded, checked and activated as required
  6. Current approach chart for the approach to be flown is selected and briefed to flight crew
  7. Navigation aid required for approach is checked and confirmed as serviceable
  8. Conduct initial approach
  9. Aircraft is manoeuvred to holding fix
  10. Conduct a holding pattern
  11. Aircraft is flown in accordance with relevant approach procedure requirements
  12. Automation is used appropriately
  13. Approach is performed correctly and within published tolerances
  14. Navigation aid signal integrity is monitored during approach
  15. Aircraft is flown to a stabilised descent profile from final approach fix to minima
  16. Visual reference is established and a visual circling or runway approach conducted for a landing on the selected runway
  17. Conduct a missed approach
  18. Aircraft is manoeuvred to missed approach point (MAPt)
  19. Missed approach procedure is conducted in accordance with the instrument approach and landing (IAL) chart
  20. Obstacle clearance in instrument meteorological conditions (IMC) or simulated IMC is maintained