Google Links

Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Plan hoisting operations
  2. Crew and equipment required to ensure safe achievement of task are determined
  3. Helicopter performance data is interpreted and calculated to ensure suitability of aircraft for operations
  4. Transit, hoisting operation communications and recovery are planned in accordance with workplace procedures
  5. Operations at hoist site, including consideration of obstructions, terrain and any factors that may adversely affect lift, are planned
  6. Abnormal and emergency hoisting situation contingency procedures are planned
  7. Conduct pre-flight briefings
  8. Location, terrain features (sea state as required) and forecast weather conditions are obtained and confirmed with relevant personnel
  9. Timings, route/s, airspeeds and altitudes are confirmed with relevant personnel
  10. Relevant personnel are briefed about pilot, crew and hoisting personnel responsibilities and communication procedures
  11. Abnormal and emergency hoisting situation contingency procedures are briefed
  12. Operate a helicopter during hoisting operations
  13. Site inspection, approach and hover heading are determined in accordance with operational requirements
  14. Descent and approach are controlled to terminate over hoist site
  15. Control is applied to helicopter to maintain position over hoist site
  16. Obstacle clearances to obstructions, constructions and terrain are maintained during deployment and retrieval operation
  17. Effective communications with crew and relevant personnel are maintained during operation
  18. Safety and security of passengers and/or cargo is managed
  19. Hoist cable is recovered and stowed, and site is vacated in accordance with workplace procedures
  20. Manage abnormal and emergency situations
  21. Abnormal and/or emergency situations are identified and managed
  22. Hoist cargo/personnel are safely jettisoned (as required) when flight safety or hover stability is compromised
  23. Conduct post-flight briefings
  24. Effectiveness, efficiency and performance of equipment are analysed and reported
  25. Inspection, servicing and stowage of hoist equipment are organised/confirmed