Elements and Performance Criteria
- Plan and prepare.
- Work instructions, including plans, specifications, quality requirements and operational details, are obtained, confirmed and applied from relevant information for planning and preparation purposes.
- Safety (OHS) requirements are followed in accordance with safety plans and policies.
- Signage and barricade requirements are identified and implemented.
- Plant, tools and equipment selected to carry out tasks are consistent with job requirements, checked for serviceability, and any faults are rectified or reported prior to commencement.
- Material quantity requirements are calculated in accordance with plans, specifications and quality requirements.
- Materials appropriate to the work application are identified, obtained, prepared, safely handled and located ready for use.
- Environmental requirements are identified for the project in accordance with environmental plans and statutory and regulatory authority obligations, and are applied.
- Set out formwork.
- Assemble core form system.
- Internal prefabricated system wall form shutters are erected and fixed into location according to engineer's drawings.
- System is fitted to concrete nib walls to heights consistent with engineer's requirements.
- Shear key feet are installed to manufacturer specifications.
- Platforms and assembly are fitted into core to manufacturer specifications.
- Structural steel system grid work and hydraulic hose lines are fitted to manufacturer specifications.
- Wall form shutters are suspended and system cladding and platforms are fitted and completed to manufacturer specifications and engineer's requirements.
- Locate and install penetrations.
- Conduct slip system.
- External prefabricated system wall shutters are erected and fixed to engineer's and manufacturer specifications.
- Shutters are loosened and stripped according to manufacturer's and OHS requirements.
- Rigger is communicated with to activate electrical/hydraulic jacking of the system to the new position.
- Trailing platforms are installed to engineer's specifications.
- Formwork is dismantled in accordance with manufacturer and engineer's specifications.
- Clean up.
- Work area is cleared and materials disposed of, reused or recycled in accordance with legislation, regulations, codes of practice and job specification.
- Plant, tools and equipment are cleaned, checked, maintained and stored in accordance with manufacturer recommendations and standard work practices.