Elements and Performance Criteria
- Plan and prepare to conduct off-form vertical concrete operations.
- Review and clarify task to conduct off-form vertical concrete operations.
- Review task specifications and check to make sure they are in accordance with legislation, regulations and codes of practice.
- Review work health and safety (WHS) requirements for the task in accordance with safety plans and policies.
- Identify safety signage and barricade requirements.
- Review environmental requirements for the task in accordance with environmental plans and legislative requirements.
- Select plant, tools and equipment, check for serviceability and rectify or report any faults.
- Calculate material quantity requirements.
- Acquire materials for the task and locate them safely ready for use.
- Set out and prepare slip-form or jump-form location.
- Erect identified safety signage and barricades, and fit personal protective equipment (PPE).
- Set out the location and size of pour to requirements of job drawings and specifications.
- Prepare equipment specifically associated with the installation of slip-formwork or jump-formwork concrete projects.
- Prepare, place and fix edge formwork with plumb and align to specifications.
- Apply form release agent to slip-formwork or jump-formwork with appliance or machine to specifications.
- Place and tie reinforcement and cast-in fittings.
- Check reinforcement, accessories and cast-in fittings for conformity with design and specifications.
- Position reinforcement and accessories in accordance with engineering drawings and specifications.
- Tie and/or weld reinforcement in correct placement in accordance with engineering drawings and specifications.
- Place, finish and cure concrete.
- Determine sequencing of concrete from specifications.
- Place concrete evenly into formwork in layers and consolidate to specification, avoiding material segregation and using approved compaction method.
- Screed and finish concrete surface to specification ensuring cast-in fittings are clear.
- Add curing compound in accordance with specifications.
- Continue placement cycle after slip-form or jump-form formwork is progressed by riggers, avoiding cold joint.
- Clean up after conducting off-form vertical concrete operations.