Elements and Performance Criteria
- Plan and prepare.
- Work instructions and operational details are obtained using relevant information, confirmed and applied for planning and preparation purposes.
- Safety (OHS) requirements are followed in accordance with safety plans and policies.
- Signage and barricade requirements are identified and implemented.
- Tools and equipment selected to carry out tasks are consistent with the requirements of the job, checked for serviceability and any faults are rectified or reported prior to commencement.
- Materials quantity requirements are calculated in accordance with plans, specifications and quality requirements.
- Materials appropriate to the work application are identified, obtained, prepared, safely handled and located ready for use.
- Environmental requirements are identified for the project in accordance with environmental plans and regulatory obligations and applied.
- Select dogging equipment.
- Resources, materials and equipment are selected and inspected for compliance with job specifications.
- Job sequencing schedule is communicated with team members and others to ensure coordination.
- Load mass is calculated and confirmed using load charts and standard calculations.
- Loads in slings and equipment are calculated to suit job requirements.
- Sling loads.
- Shift loads.
- Remove dogging equipment.
- Clean up.
- Work area is cleared and materials disposed of, reused or recycled in accordance with legislation, regulations, codes of practice and job specification.
- Tools and equipment are cleaned, checked, maintained and stored in accordance with manufacturer recommendations and standard work practices.
- Work completion procedures are applied and relevant personnel notified that work is finished.