Elements and Performance Criteria
- Plan and prepare.
- Work instructions, including plans, specifications, quality requirements and operational details are obtained from relevant information, confirmed and applied to the scope of work to be performed.
- Safety (OHS) requirements are followed in accordance with safety plans and policies.
- Signage and barricade requirements are identified and implemented.
- Plant, tools and equipment selected to carry out tasks are consistent with the requirements of the job, checked for serviceability and any faults are rectified or reported prior to commencement.
- Material quantity requirements are calculated in accordance with plans, specifications and quality requirements.
- Materials appropriate to the work application are identified, obtained, prepared, safely handled and located ready for use.
- Environmental requirements are identified for the project in accordance with environmental plans and statutory and legislative authority obligations and applied.
- Select equipment.
- Resources, materials and equipment are selected in accordance with load charts and inspected for compliance with job specifications.
- Lifting equipment is inspected according to manufacturer specifications.
- Lifting and load shifting equipment identified as inconsistent with manufacturer specifications is labelled, rejected and disposed of to prevent its use in any circumstance.
- Elevated work platforms and other means of mechanical access systems are determined and selected where specified.
- Fall arrest equipment is installed.
- Personnel cartage systems are identified and selected.
- Erect tilt-up slabs.
- Job sequencing schedule and documentation are identified and communicated to team members to ensure coordination.
- Load mass is calculated and confirmed.
- Erection sequence for tilt-up slab components is identified.
- Lifting or pulling devices are assembled and erected for the movement of loads.
- Load is slung.
- Load is shifted in accordance with job safety analysis (JSA) and safe work method statement.
- Stability of load is maintained during lifting, tilting and transportation.
- Load is directed to landing position in accordance with engineer's specifications.
- Position and anchor.
- Remove rigging equipment.
- Clean up.
- Work area is cleared and materials disposed of, reused or recycled in accordance with legislation, regulations, codes of practice and job specification.
- Plant, tools and equipment are cleaned, checked, maintained and stored in accordance with manufacturer recommendations and standard work practices.
- Work completion procedures are applied and relevant personnel notified that work is finished.