Elements and Performance Criteria
- Plan and prepare work.
- Quality assurance requirements of signage operations are recognised and adhered to.
- Safety (OHS) requirements are recognised and adhered to in accordance with application tasks and workplace operations.
- Job requirements are identified from drawings, specifications, instructions and/or client briefs.
- Product range is assessed and selected in accordance with job requirements and relevant Australian standards.
- Paint systems and materials are selected to carry out tasks consistent with job requirements.
- Tools and equipment are selected to carry out tasks consistent with job requirements.
- Routine maintenance requirements of equipment are identified and implemented in accordance with workplace and quality assurance procedures.
- Temporary or permanent application of materials is determined from job requirements.
- Prepare surface and apply undercoat or primer.
- Apply paint coating using spray application.
- Appropriate spray gun is selected, used safely and effectively and set to meet manufacturer specifications.
- Air compressor is set to meet manufacturer specifications.
- Compatible coating type for substrate is selected and the correct viscosity of paint is determined for specified application.
- Coating is applied evenly over the surface area.
- Tools and equipment are cleaned using the correct cleaning products and procedures.
- Apply paint coating using brush application.
- Apply paint coating using roller application.
- Clean up.