Elements and Performance Criteria
- Plan and prepare work.
- Quality assurance requirements of signage operations are recognised and adhered to.
- Safety (OHS) requirements in accordance with application tasks and workplace operations are recognised and adhered to.
- Job requirements are identified from drawings, specifications, instructions and client briefs.
- Product range is assessed and selected in accordance with job requirements and relevant Australian standards.
- Tools and equipment and materials are selected to carry out tasks consistent with job requirements.
- Routine maintenance requirements of equipment is identified and implemented in accordance with workplace and quality assurance procedures.
- Temporary or permanent application of materials is determined from job requirements.
- Fabricate and assemble three-dimensional acrylic or light metal signage.
- Correct materials for three-dimensional acrylic or light metal signage are identified and assembled for job.
- CAD CAM routing equipment is correctly used to cut signage to job specifications.
- Acrylic heating equipment is correctly selected and used to form acrylic signage safely and to design specifications.
- Three-dimensional signage is correctly assembled using appropriate techniques.
- Sign is assembled using attachments and techniques suitable for the signage materials.
- Clean up finished sign.
- Completed three-dimensional acrylic or light metal signage is trimmed to a professional finish.
- Sign and surrounding surface environment/area are cleaned and waste materials removed in accordance with statutory and regulatory authority requirements.
- Tools and equipment, including personal protective equipment, are cleaned, maintained and stored.