Elements and Performance Criteria
- Prepare for installation of staging
- Prepare venue at the appropriate time in accordance with bump-in schedule
- Read, correctly interpret and apply stage plans to venue layout
- Identify and liaise with relevant personnel to determine the sequence of installation for staging elements
- Where there is an existing stage, communicate modifications clearly to relevant personnel and implement as required
- Install other equipment and necessary structures in consultation with the relevant personnel
- Pre-rig equipment as required within safety guidelines and licensing requirements
- Install staging elements
- Mark out ground plan accurately onstage in accordance with design specifications and venue requirements
- Install staging elements in accordance with design specifications and requirements of the production
- Install staging elements in the appropriate sequence as agreed with relevant personnel
- Install staging elements in accordance with safety regulations and any manufacturer instructions
- Select and use appropriate equipment to assist with staging installation, using safe working practices at all times
- Check staging elements after installation
- Check each staging element to ensure operational standards for performance are achieved and that all safety requirements have been met
- Identify any problems with staging elements, take appropriate action to rectify or refer to relevant personnel for action
- Identify any modifications required to improve suitability for performance and take appropriate action