Elements and Performance Criteria
- Prepare to operate electronic coding equipment
- Product and materials are confirmed and available to meet electronic coding requirements
- Product and materials are prepared to meet electronic coding requirements
- Services are confirmed as available and ready for operation
- Electronic coding equipment is prepared and checked to confirm readiness for use
- Equipment is set to meet coding requirements
- Input, store and retrieve data
- Operate and monitor the electronic coding process
- Electronic coding equipment is started up according to workplace procedures
- Control points are monitored to confirm performance is maintained within specification
- Product is coded according to specification
- Electronic coding equipment is monitored to confirm operating condition
- Out-of-specification end product, process and equipment performance is identified, rectified and/or reported
- Shut down the electronic coding process
- Electronic coding equipment is shut down according to workplace procedures
- Electronic coding equipment is prepared for cleaning
- Waste generated by both the process and cleaning procedures is collected, treated and disposed of, or recycled according to workplace procedures
- Work is conducted in accordance with workplace environmental guidelines
- Record information