Elements and Performance Criteria
- Prepare to operate softpack filling equipment
- Products and materials are confirmed and available to meet filling requirements
- Products and materials are prepared to meet filling requirements
- Services are confirmed as available and ready for operation
- Softpack filling equipment is prepared and checked to confirm readiness for use
- Equipment is set to meet filling requirements
- Operate and monitor the softpack filling process
- Softpack filling equipment is started up according to workplace procedures
- Control points are monitored to confirm performance is maintained within specification
- Softpacks are filled according to specification
- Softpack filling equipment is monitored to confirm operating condition
- Out-of-specification product, processes and equipment are identified, rectified and/or reported
- Shut down the softpack filling process
- Softpack filling equipment is shut down according to workplace procedures
- Softpack filling equipment is prepared for cleaning
- Waste generated by both the process and cleaning procedures is collected, treated and disposed of, or recycled according to workplace procedures
- Work is conducted in accordance with workplace environmental guidelines
- Record information