Elements and Performance Criteria
- Prepare to construct underground work
- Obtain construction design plan from appropriate personnel to scope the work and arrange for site access
- Notify appropriate personnel of identified safety hazards and other services
- Obtain plant, tools and safety equipment to perform tasks safely and efficiently
- Determine the type of undergroundenclosure specified in the construction design plan that is required for the project
- Install enclosure
- Use tools according to enterprise guidelines and occupational health and safety (OHS) regulations
- Place a foundation of suitable material to provide a safe and stable footing prior to installing an underground enclosure in an excavation
- Place a recognised barrier over the construction where an enclosure is to be installed over power cables according to enterprise requirements or agreements with other authorities
- Install an enclosure specified in the construction design plan to manufacturer's specifications using the specified materials
- Install an earth mat facility under the enclosure where specified and required by the enterprise
- Install connecting pipe works
- Complete project
- Complete reports according to enterprise policy and record alterations to plans using appropriate symbols
- Recover obsolete materials and equipment and return to appropriate point for disposal
- Restore site according to the requirements of enterprise or approving authority and to customer satisfaction
- Notify appropriate personnel of job completion and obtain sign off