Elements and Performance Criteria
- Identify conservation requirements
- Applicable OHS, legislative and organisational requirements relevant to lead light and stained glass operations are verified and complied with
- Detailed inspections of the heritage lead light and stained glass are conducted to verify conservation requirements
- Conservation requirements are identified confirmed and clarified with appropriate personnel
- Plan conservation processes
- Prepare for the conservation process
- Tools and equipment are positioned and checked prior to use to ensure that they are appropriate for the task, serviceable and in a safe condition
- Plans and other documents are positioned to allow for confirmation of the panel structure
- Outline charcoal rubbings are made to confirm design during the process
- Photographs are taken of the panel for later reference
- Conduct the conservation process
- Finalise and report on the assessment
- Conserved lead light and stained glass panel is inspected for quality of work and problems are rectified
- Tools and equipment are removed cleaned and stored appropriately
- Conservation area is cleaned and rubbish disposed of as appropriate
- Panel is packaged and stored prior to movement and installation.
- Conservation report is prepared and provided as required