Elements and Performance Criteria
- Plan maintenance activities
- Inspections are conducted and additional non-routine maintenance requirements are determined
- Manufacturer specifications for machinery and equipment are obtained
- Tasks are planned and sequenced in conjunction with others involved in or affected by maintenance work
- Consumables and equipment are selected and checked for serviceability
- Complete preventative maintenance
- WHS/OHS risk control measures and procedures for carrying out work are followed
- Preventative maintenance is carried out in compliance with technical specifications
- Methods for dealing with unexpected situations are selected on the basis of safety and specified work outcomes
- Maintenance work is checked to verify that it conforms to technical specifications and complies with survey requirements, as required
- Complete breakdown maintenance
- Restrictions are applied to operations, where necessary, and Master is informed
- Machinery and equipment is safely isolated according to WHS/OHS requirements and organisational practices
- Repair work is carried out according to technical specifications
- Master is notified of completion of repair work and details are documented
- Complete hull maintenance
- Deterioration in vessel structure, equipment and fittings is identified
- Checks on propeller, stern tube and rudder are carried out in accordance with organisational procedures, safety regulations and survey requirements
- Maintenance work is checked to verify it conforms to technical specifications and complies with survey requirements, as required
- Clean up and complete documentation
- Materials are disposed of or recycled according to legislative and workplace requirements
- Tools and equipment are cleaned, checked and stored according to workplace procedures
- Machinery and equipment is returned to service and monitored for correct operation according to organisational practices
- Maintenance report is completed according to workplace procedures