Elements and Performance Criteria
- Remove pneumatic system components
- Pneumatic system is rendered safe and prepared in accordance with the applicable maintenance manual and isolation tags are fitted, where necessary, to ensure personnel safety
- Removal of components is carried out in accordance with the applicable maintenance manual while observing all relevant work health and safety (WHS) requirements, including the use of material safety data sheets (MSDS) and items of personal protective equipment (PPE)
- Required maintenance documentation is completed and processed in accordance with standard enterprise procedures
- Removed components are tagged, sealed and packaged in accordance with specified procedures
- Install pneumatic system components
- Components to be installed are checked to confirm correct part numbers, serviceability and modification status
- Installation is carried out to pneumatic system in accordance with the applicable maintenance manual while observing all relevant WHS requirements, including the use of MSDS and items of PPE
- Required maintenance documentation is completed and processed in accordance with standard enterprise procedures