Elements and Performance Criteria
- Inspect aircraft structure
- Relevant maintenance documentation is used to identify specific inspection requirements
- Appropriate preparation and access to the aircraft structure is undertaken to allow for proper inspection in accordance with maintenance documentation
- Aircraft structure is visually or physically checked for signs of deformation defects or damage in accordance with maintenance documentation and approved procedures while observing all relevant work health and safety (WHS) requirements, including the use of material safety data sheets (MSDS) and items of personal protective equipment (PPE)
- Damage or defects are assessed against damage or wear limits specified by structural repair manual or other approved data to determine if repair or replacement is required
- Maintenance documentation is completed and processed in accordance with standard enterprise procedures
- Maintain aircraft structure
- Minor repairs classified as elementary maintenance are performed in accordance with approved repair methods ensuring that aircraft standard practices are used and process requirements are carried out while observing all relevant WHS requirements, including the use of MSDS and items of PPE
- Preventative maintenance techniques are employed to preserve the integrity of aircraft structure
- Work area is cleaned of all waste material or contaminants
- Required maintenance documentation is completed and processed in accordance with standard enterprise procedures
- Remove components
- Structure is supported and prepared in accordance with the applicable maintenance manual to ensure personnel safety and freedom from damage to aircraft or component during component removal
- Component removal is carried out in accordance with the applicable maintenance manual while observing all relevant WHS requirements, including the use of MSDS and items of PPE
- Required maintenance documentation is completed and processed in accordance with standard enterprise procedures
- Where applicable, removed components are tagged and prepared for transport in accordance with specified procedures
- Install components
- Structural and/or non-structural components to be installed are checked to confirm correct part numbers, serviceability and modification status
- Component installation is carried out in accordance with the applicable maintenance manual while observing all relevant WHS requirements, including the use of MSDS and items of PPE
- Support/safety equipment is removed at an appropriate time to ensure personnel safety and freedom from structural damage
- Required maintenance documentation is completed and processed in accordance with standard enterprise procedures