Elements and Performance Criteria
- Locate split air conditioning components
- Required split air conditioning unit, piping and other components are identified from job and manufacturer specifications and diagrams.
- The location of unit components, piping and drains is determined in consultation with customer and other site considerations.
- Industry and local authority requirements, standards and codes and manufacturer requirements are identified including the appropriate capacity rating of the equipment and any impacts on the installation are identified.
- Inspect and prepare installation sites
- All work is carried out safely to Australian Standards, state and local codes and regulations.
- The installation site is prepared as appropriate to industry codes of practice and manufacturer installation instructions.
- The work is carried out without damage to the system, components and the surrounding environment or services.
- Prepare split system equipment and materials for installation
- Safety hazards are identified and noted and established risk control measures are implemented.
- Appropriate personnel are consulted to ensure the work is coordinated effectively with others involved on the work site.
- All components, piping and fittings are properly checked for conformance to manufacturer specification, job requirements and applicable standards.The layout of the pipe work is determined from job specifications and diagrams.
- Materials needed to carry out the work are obtained in accordance with established procedures and checked against job requirements.
- Tools, equipment and testing devices needed to conduct the work are obtained in accordance with established procedures and checked for correct operation and safety.
- Preparatory work is checked to ensure no damage has occurred and that it complies with work requirements.
- Prepare and install refrigerant pipework
- Safe work practices/risk control measures are applied as required.
- Tools and equipment are used safely and in accordance with manufacturer instructions.
- Pipework is prepared and joined to required specification with minimal wastage and damage/contamination to environment.
- Pipework and fittings are joined using appropriate pipe joining methods.
- Pipes are run separately and insulated according to manufacturer instructions and to relevant standards codes and regulations.
- Pipework and joins are checked for compliance and integrity using appropriate testing methods.