Elements and Performance Criteria
- Identify job requirements
- Load components
- Pre-start checks are undertaken to standard operating procedures.
- Correct safety procedures are observed and safety equipment is checked for correct operation.
- Correct fixture/clamping device is selected.
- Component and fixtures are loaded and clamped in accordance with standard operating procedures.
- Set probes
- Measure components
- Part program is selected as required, run and verified according to standard operating procedures.
- Components are measured according to standard operating procedures.
- Results are interpreted and non-conforming/out of tolerance measurements are identified and reported.
- Part program is correctly shut down and components are removed according to standard operating procedures.
- Coordinate measuring machine, accessories and surrounds are left in a clean, safe condition.