Google Links

Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Undertake preventative maintenance checks/adjustments on pneumatic systems
  2. Undertake fault finding on pneumatic systems
  3. Repair and/or overhaul pneumatic power system
  4. Recommission pneumatic system

Required Skills

Required skills

Look for evidence that confirms skills in

preparing pneumatic system components for inspectionpreventative maintenance

inspecting and testing pneumatic system and components

performing scheduled preventative maintenance tasks

performing repairs on the pneumatic systemcomponents as required

visually inspecting pneumatic system and its components for indications of correctincorrect operation

consulting system operator with respect to the fault being investigated

obtaining and interpreting maintenance reports and preventative maintenance schedules

checkingtesting pneumatic systemcomponent operation

verifyingconfirming apparent faultsmalfunctions

documenting or reporting verified faultsmalfunctions

initiating repairoverhaul of the pneumatic system

isolating and depressurising pneumatic system

checking pneumatic system to ensure isolation and depressurisation

tagging isolated pneumatic system

removing pneumatic componentssubassembly from the system

dismantling pneumatic componentssubassemblies

examining pneumatic componentssubassemblies and their parts for conformance to specification

selecting replacement parts selected from manufacturers catalogues

overhauling faulty items

refitting pneumatic componentsubassembly into the system

testing pneumatic componentsubassembly for correct operation

recommissioning pneumatic systemsubassembly to specification

checkingtesting pneumatic systemsubassembly for correct operation

initiating followup procedures

updating and completing maintenance recordsreports

Required knowledge

Look for evidence that confirms knowledge of

common pneumatic system components

pneumatic systemcomponent faults that can be determined by visual inspection

the application of common pneumatic systemcomponent test equipment

scheduled preventative maintenance tasks

manufacturers specifications

common pneumatic system and component faults

any previous faults in the pneumatic systemcomponents

any previous maintenance carried out on the pneumatic systemcomponents

typical checkstests that can be carried out on pneumatic systemscomponents and their application

pneumatic systemcomponent tests and testing techniques

apparent faultsmalfunctions

documentationreporting requirements with respect to verified faultsmalfunctions

procedures for initiating repair andor overhaul of the pneumatic system

hazards associated with working on pneumatic systemscomponents including housekeeping

the procedures for isolating and depressurising pneumatic systems

the tagging requirements for isolated systems

the structure of typical pneumatic components

specifications of pneumatic components and their constituent parts

reasons for deciding to repair replace or overhaul pneumatic components

system recommissioning procedures

the pneumatic system operational specifications

any appropriate followup maintenance or operational checks

maintenance recordingreporting requirements

consequences of inaccurate or incomplete recordingreporting of maintenanceservice activities

pneumatic principles

safe work practices and procedures

Evidence Required

The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria required skills and knowledge range statement and the Assessment Guidelines for the Training Package

Overview of assessment

A person who demonstrates competency in this unit must be able to maintain pneumatic systems Competency in this unit cannot be claimed until all prerequisites have been satisfied

Critical aspects for assessment and evidence required to demonstrate competency in this unit

Assessors must be satisfied that the candidate can competently and consistently perform all elements of the unit as specified by the criteria including required knowledge and be capable of applying the competency in new and different situations and contexts

Context of and specific resources for assessment

This unit may be assessed on the job off the job or a combination of both on and off the job Where assessment occurs off the job that is the candidate is not in productive work then an appropriate simulation must be used where the range of conditions reflects realistic workplace situations The competencies covered by this unit would be demonstrated by an individual working alone or as part of a team The assessment environment should not disadvantage the candidate

This unit could be assessed in conjunction with any other units addressing the safety quality communication materials handling recording and reporting associated with maintaining and repairing pneumatic systems or other units requiring the exercise of the skills and knowledge covered by this unit

Method of assessment

Assessors should gather a range of evidence that is valid sufficient current and authentic Evidence can be gathered through a variety of ways including direct observation supervisors reports project work samples and questioning Questioning techniques should not require language literacy and numeracy skills beyond those required in this unit of competency The candidate must have access to all tools equipment materials and documentation required The candidate must be permitted to refer to any relevant workplace procedures product and manufacturing specifications codes standards manuals and reference materials

Guidance information for assessment


Range Statement

The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.

Preventative maintenance checks

Preventative maintenance is undertaken on a periodic basis and appropriate documentation is maintained

Systems

For the purposes of this unit, a system is regarded as a functionally related group of elements. The unit extends to tests involving interacting, interrelated, or interdependent components

Test equipment

Leak testers, escape rate gauges, hand held pressure testers and other appropriate equipment

Repair

Rectify, replace components, determine for reuse