Elements and Performance Criteria
- Report results
- Determine job requirements
- Comply with work health and safety (WHS) requirements at all times
- Use appropriate personal protective equipment (PPE) in accordance with SOPs
- Identify job requirements from specifications, job sheets or work instructions
- Disconnect fluid conveying components and assemblies
- Note, record and label lay out of fluid conveying conductor
- Identify faulty component/assembly using specific troubleshooting procedures, reference documents and fluid power principles
- Disconnect and remove fluid conveying components and assemblies using appropriate tools, equipment, procedures and techniques
- Seal open system adequately with standard or special purpose sealing materials
- Obtain replacement parts
- Test and store components
- Assess and note condition
- Clean, seal and store components/assemblies according to industry and manufacturer standards
- Connect fluid conveying components and assemblies
- Connect components and assemblies to equipment to specifications using appropriate techniques
- Remove tagged out equipment, signage and safety blocking devices according to SOPs
- Check equipment and fluid conveying systems and functional test, including in-situ and high pressure test rigs for correct operation according to manufacturer and industry standards
- Complete all relevant information