Google Links

Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Determine job requirements
  2. Comply with work health and safety (WHS) requirements at all times
  3. Use appropriate personal protective equipment (PPE) in accordance with SOPs
  4. Identify job requirements from specifications, drawings, job sheets or work instructions
  5. Undertake preventive maintenance checks
  6. Perform preventative maintenance tasks to manufacturers' specifications
  7. Undertake fault-finding on cooling tower/evaporative condenser water systems components
  8. Interpret the characteristics and operation of each component
  9. Inspect and test the operational function of each component and assess correct operation against specifications
  10. Repair/replace cooling tower/evaporative condenser components
  11. Remove the refrigerant safely from the system and contain in accordance with procedures and regulatory requirements, where appropriate
  12. Dismantle faulty components and repair to manufactures' specifications, as required
  13. Select replacement parts from manufacturers' catalogues
  14. Return to service cooling tower/evaporative condenser components
  15. Charge the system safely with correct refrigerant and in accordance with procedures and regulatory requirements, where appropriate
  16. Verify correct operation of the equipment
  17. Complete maintenance records/service reports according to SOPs

Range Statement

This field allows for different work environments and conditions that may affect performance. Essential operating conditions that may be present (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) are included.

Components include one (1) or more of the following:

fan motor

fan blade

pump

pump motor

sprays

condenser

valves (bypass, shut-off and temperature control valves)

thermostat

drift eliminators

V belt

water strainer

Test equipment includes one (1) or more of the following:

sling psychrometer

thermometer

refrigeration gauges

vacuum pump

leak detector

multimeter

insulation resistance tester