Elements and Performance Criteria
- Interpret design brief for fluid power systems
- Confirm the design brief and operational requirements with the client
- Establish technical, commercial and environmental parameters to the brief or contract
- Determine stakeholders to be consulted in design process
- Consider regulatory, sustainability or environmental issues relevant to the briefs
- Provide preliminary advice to client on the feasibility for realising the fluid power system design