Elements and Performance Criteria
- Plan removal processes
- Identify and follow work health and safety, legislative and organisational requirements
- Establish, confirm and clarify purpose and required outcome of the removal with appropriate personnel
- Determine location of the leadlight and stained glass panels to be removed and inspect for information relevant to the process
- Review condition report and identify required removal sequence
- Develop a removal work plan with approval of relevant people
- Prepare for removal
- Assemble, position tools and equipment and check prior to use to ensure they are appropriate for the removal, serviceable and in a safe condition
- Prepare and position supporting frames and storage materials
- Assemble and position plans and other documents to allow for confirmation of the panel structure and placement
- Take photographs of the panel before, during and after removal
- Remove the panel
- Finalise and report on the removal
- Inspect removed panel for damage of all types
- Remove, clean and store tools and equipment appropriately
- Clean removal area and dispose of rubbish appropriately
- Prepare and provide condition report that includes detailed photographic evidence with details of issues and recommendations regarding remedial work
- Develop a work plan and cost estimate for all required further conservation work