Elements and Performance Criteria
- Plan installation requirements
- Identify and follow work health and safety, legislative and organisational requirements
- Establish, confirm and clarify location of the leadlight and stained glass panel to be installed with appropriate personnel
- Identify removal and reinstallation sequence and develop a work plan with approval of relevant people
- Prepare for installation
- Position and check tools and equipment prior to use to ensure they are appropriate for the installation, serviceable and in a safe condition
- Conduct inspection of the opening where the panel is to be installed
- Inspect leadlight and stained glass panel to ensure its integrity prior to installation
- Position plans and other documents to allow for confirmation of the panel structure and placement
- Take photographs before installation of the panel for inclusion in reference report
- Install the panel
- Finalise and report on the installation