Elements and Performance Criteria
- Identify work requirements
- Identify and follow work health and safety, legislative and organisational requirements
- Read work documentation and identify job requirements
- Inspect subfloors against requirements of Australian Standards to ensure that they are dry, smooth, plane, and sound and confirm extent of required preparation and work
- Select and check tools, equipment and materials for suitability, serviceability and safety prior to use
- Inspect subfloors to determine irregularities
- Inspect and confirm construction type, structure and sub-structure
- Run and check datum lines and confirm accurate dimensions
- Inspect and identify nature and extent of surface irregularities
- Check subfloors and walls for contamination, moisture content, plane, smooth and suitable preparation
- Clean surface using suitable floor preparation equipment and or cleaning agents in accordance with manufacturer recommendation
- Select primers, additives and cementitious compounds
- Determine suitability of the primers and compounds for compatibility and levelling requirements through trial applications
- Select suitable primers, additives and cementitious compounds based on their functions in accordance with the needs of the job
- Select method of application based on job requirements
- Apply selected primers to the subfloor in accordance with manufacturer instructions
- Prepare additives and cementitious compounds
- Apply cementitious compounds and additives
- Complete housekeeping