Elements and Performance Criteria
- Prepare for work
- Identify and follow work health and safety, legislative and organisational requirements
- Correctly identify work requirements and process from review of documentation
- Confirm floor suitablity for installation consistent with Australian Standards, industry standards and manufacturer recommendations
- Select adhesives, mouldings, trims and fixings based on job requirements
- Select and check tools, equipment and materials prior to use to ensure that they are appropriate for the work, serviceable and in a safe condition
- Plan sequence of work, including the starting point, to ensure efficiency and quality of installation
- Set out materials for installation
- Cut mouldings and trims
- Follow instructions and sequence for cutting and fixing
- Lay out mouldings and trims to meet directional sequence, pattern match, specification requirements and to minimise waste and joins
- Maximise the aesthetics of the materials, where appropriate, matching grains and colours
- Accurately and clearly mark moulding and trim materials for cutting
- Cut moulding and trim to length and size for final fixing ensuring minimum waste
- Fix mouldings/trims
- Prepare adhesives, mechanical fixings and accessories for use in accordance with manufacturer instructions
- Use fixing methods and equipment in accordance with manufacturer recommendations
- Fit skirting boards and/or mouldings to perimeter walls allowing for expansion joints
- Fit and/or re-fit cover trims and edge strips to expansion joints and transitions of the timber flooring
- Inspect finished job and rectify any imperfections in accordance with workplace procedures
- Complete housekeeping
- Store and recycle unused materials in accordance with workplace procedures
- Check, clean and store tools and equipment in accordance with workplace procedures
- Clean work area and dispose of rubbish safely
- Accurately complete required workplace documentation
- Identify and follow work health and safety, legislative and organisational requirements
- Correctly identify work requirements and process from review of documentation
- Confirm floor suitablity for installation consistent with Australian Standards, industry standards and manufacturer recommendations
- Select adhesives, mouldings, trims and fixings based on job requirements
- Select and check tools, equipment and materials prior to use to ensure that they are appropriate for the work, serviceable and in a safe condition
- Plan sequence of work, including the starting point, to ensure efficiency and quality of installation