Google Links

Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Prepare for work
  2. Lay moisture membrane
  3. Cut and fix timber battens
  4. Cut and fix timber flooring
  5. Lay strip timber flooring
  6. Complete housekeeping

Range Statement

Specifies different work environments and conditions that may affect performance. Essential operating conditions that may be present (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) are included. Range is restricted to essential operating conditions and any other variables essential to the work environment.

Unit context includes:

WHS requirements, including legislation, building codes, material safety management systems, hazardous and dangerous goods codes, and local safe operating procedures or equivalent

work is carried out in accordance with legislative obligations, environmental legislation, relevant health regulations, manual handling procedures and organisation insurance requirements

work requires individuals to demonstrate some discretion, judgement and problem solving

Strip timber flooring onto battens includes:

strip tongue and groove floating floors

manufactured engineered flooring

Adhesives include:

polyvinyl alcohol (PVA)

polyurethane elastomeric

Tools and equipment include:

drop saw

jig saw

hand saw

undercut saw

hammer

bar scriber

utility knife

circular saw

bench saw

straight edge

cramps

clamps

staple gun

secret nailer

roller

sanding machines (drum, belt and rotary)

edger

Materials include:

flooring materials

timber battens

edge strips

tapes

adhesives

metal fixings

ventilated skirtings

Timber battens include:

timber battens with a density less than or equal to 600 Kg/m3, greater than 600 Kg/m3

Personal protective equipment includes:

that prescribed under legislation, regulations and enterprise policies and practices

Information and procedures include:

workplace procedures relating to the use of tools and equipment

work instructions, including job sheets, cutting lists, plans, drawings and designs

workplace procedures relating to reporting and communication

manufacturer specifications and operational procedures


Performance Evidence

Interpret work order and locate and apply relevant information

Apply safe handling requirements for equipment, products and materials, including use of personal protective equipment

Identify materials used in the work process

Follow work instructions, operating procedures and inspection processes to:

minimise the risk of injury to self or others

prevent damage to goods, equipment and products

maintain required production output and product quality

Complete a minimum of one (1) installation of strip timber flooring onto battens

Use mathematical ideas and techniques to correctly complete measurements, calculate area and estimate material requirements

Communicate ideas and information to enable confirmation of work requirements and specifications and the reporting of work outcomes and problems, interpret basic plans and follow safety procedures

Avoid backtracking, work flow interruptions or wastage

Work with others and in a team by recognising dependencies and using cooperative approaches to optimise work flow and productivity


Knowledge Evidence

State or territory WHS legislation, regulations, standards and codes of practice relevant to installation of strip timber flooring

Organisational and site standards, requirements, policies and procedures for the installation of strip timber flooring

Environmental protection requirements

Types, characteristics, uses and limitations of:

strip timber flooring installed onto battens

installation adhesives used in timber flooring

timber battens

Types and uses of tools and equipment used during the installation of strip timber flooring

Basic wood working techniques relevant to the installation of timber strip flooring installed onto to battens

Workplace safety system requirements relevant to the installation of strip timber flooring installed onto battens

Work flow in relation to the laying of strip timber flooring onto battens operations

Characteristics and requirements of sub-floor preparation

Appropriate mathematical procedures for estimation and measurement

Procedures for the recording, reporting and maintenance of workplace records and information