Elements and Performance Criteria
- Prepare for installation
- Identify and follow work health and safety, legislative and organisational requirements
- Read documentation and identify work requirements and process
- Select and check tools, equipment and materials for suitability, serviceability and safety prior to use
- Confirm sub-floor suitability for installation consistent with Australian Standards and manufacturer recommendations
- Select suitable adhesives, trims and accessories in accordance with work requirements
- Plan sequence of work, including the starting point, to ensure efficiency and quality of installation
- Set out materials
- Check synthetic floor covering material to be installed against work order and acclimatise in accordance with manufacturer recommendations
- Cut and lay required shock padding / underlays for synthetic turf floor coverings to specification
- Establish working lines and starting point
- Prepare adhesives and edge strips for use in accordance with job requirements
- Lay floor covering
- Identify and follow instructions and sequence for laying and fixing
- Organise and use materials for fixing in accordance with safety management requirements
- Lay out synthetic floor coverings to meet pattern and specification requirements and to minimise waste and joins
- Accurately and clearly mark synthetic floor coverings for cutting
- Cut synthetic floor coverings to length and cut joins in preparation for final laying
- Join synthetic floor coverings using adhesive and seam tape to in accordance with manufacturer instructions
- Complete required line marking in accordance with specification
- Fit and finish cover trims to required standards
- Check completed installation for flaws in installation and rectify materials and faults
- Complete housekeeping