Elements and Performance Criteria
- Prepare for installation
- Identify and follow work health and safety, legislative and organisational requirements
- Read documentation and identify work requirements
- Confirm subfloor suitability for installation consistent with Australian Standards and manufacturer recommendations.
- Select adhesives, trims and accessories based on job requirements
- Select and check tools, equipment and materials for suitability, serviceability and safety prior to use
- Plan sequence of work, including the starting point, to ensure efficiency and quality of installation
- Check resilient tiles to be installed against order and acclimatise in accordance with manufacturer recommendations
- Set out materials
- Lay resilient tiles
- Lay out materials to meet specification requirements and minimise waste
- Match or contrast material grains and patterns as appropriate
- Accurately and clearly mark resilient tiles for cutting
- Cut and lay resilient tiles to required shape with minimum waste of materials
- Place and fix trims and accessories in accordance with job requirements
- Check complete installation for flaws in installation and materials and rectify faults
- Complete housekeeping