Elements and Performance Criteria
- Prepare for installation
- Identify and follow work health and safety, legislative and organisational requirements
- Read documentation and identify work requirements
- Confirm subfloor suitability for installation consistent with Australian Standards and manufacturer recommendations
- Select adhesives, trims and accessories based on job requirements
- Select and check tools, equipment and materials for suitability, serviceability and safety prior to use
- Plan sequence of work, including the starting point, to ensure efficiency and quality of installation
- Check linoleum to be installed against work order and acclimatise in accordance with manufacturer recommendations
- Set out materials
- Identify and follow instructions and sequence for laying and fixing
- Organise linoleum floor coverings for fixing and use in accordance with safety management requirements
- Establish working lines and starting point
- Cut required soft underlay to specification
- Set out, cut and fit required pre-form fillet in accordance with specification
- Cut materials
- Lay linoleum
- Organise and use materials for welding and fixing in accordance with safety management requirements
- Use welding and fixing methods and equipment following manufacturer instructions
- Set out and install resilient skirting, reducer and edge strips in accordance with job requirements
- Check complete installation for flaws in installation and materials and rectify faults
- Complete housekeeping