Elements and Performance Criteria
- Prepare for work
- Identify and follow work health and safety, legislative and organisational requirements
- Correctly identify work requirements and process from review of documentation
- Confirm subfloor suitability for installation consistent with Australian Standards and manufacturer recommendations
- Select and check tools, equipment and materials prior to use to ensure that they are appropriate for the work, serviceable and in a safe condition
- Remove or undercut skirting boards or cover trims, and store for re-fitting in accordance with work requirements
- Plan sequence of work, and starting point, to ensure efficiency and quality of installation
- Set out mosaic parquetry flooring
- Inspect timber flooring material and confirm species, grade, size and quantity against work orders
- Moisture check timber using required equipment and confirm suitability of moisture content for site conditions as per pre-site inspection procedures
- Organise block parquetry flooring for fixing and use in accordance with safety management requirements
- Prepare required adhesives and edge strips in accordance with manufacturer instructions
- Accurately measure area to be covered and establish working lines and starting point
- Lay out and cut parquetry mosaic fingers
- Follow instructions and sequence for laying and fixing
- Lay appropriate underlay in accordance with manufacturer recommendations
- Lay out block parquetry flooring to meet directional sequence, pattern match, specification requirements, minimising waste and joins
- Maximise the aesthetics of the materials, including matching grains and colours
- Accurately and clearly mark parquetry fingers or panels for cutting
- Cut parquetry fingers or panels to provide appropriate size and shape ensuring minimum waste
- Install parquetry
- Use required adhesives and edge strips and/or accessories in accordance with manufacturer instructions
- Follow manufacturer recommendations for fixing methods and equipment
- Install and fix parquetry to produce required pattern
- Allow appropriate field and perimeter expansion joints
- Fit and/or re-fit skirting boards or cover trims and finish
- Inspect finished job and rectify any imperfections following workplace procedures
- Complete housekeeping
- Store and recycle unused materials in accordance with workplace procedures
- Check, clean and store tools and equipment in accordance with workplace procedures
- Clean work area and dispose of rubbish safely
- Accurately complete required workplace documentation
- Identify and follow work health and safety, legislative and organisational requirements
- Correctly identify work requirements and process from review of documentation
- Confirm subfloor suitability for installation consistent with Australian Standards and manufacturer recommendations
- Select and check tools, equipment and materials prior to use to ensure that they are appropriate for the work, serviceable and in a safe condition
- Remove or undercut skirting boards or cover trims, and store for re-fitting in accordance with work requirements
- Plan sequence of work, and starting point, to ensure efficiency and quality of installation