Elements and Performance Criteria
- Identify work requirements
- Purpose of the leadlight panel is established, including performance requirements in terms of safety, quality and function
- Research is conducted, where necessary, to establish if leadlight panels to be repaired are historically important
- Construction method and materials to be used in the panel to be constructed or repaired are identified
- Leadlight panel to be repaired is inspected to identify faults and any faults found compared with customer requirements and any previous identified faults
- Plan leadlight panel construction/repair
- Plan or design of leadlight panel to be constructed/repaired is analysed to identify work requirements, methods and/or specifications
- Work health and safety (WHS) requirements for construction and repair of leadlight panels, including personal protective equipment, are observed throughout the work
- Work sequences are identified and a personal work plan is developed, when required, compliant with workplace procedures
- Steps or stages in construction/repair are planned, noting check points for (any) measurements and tests
- Approval of work construction plan is obtained as required by workplace procedures and a suitable work area identified
- Identify suitable materials and equipment
- Tools and equipment are selected and checked prior to use to ensure they are appropriate for the work, serviceable and in a safe condition
- Leadlight construction materials are selected according to specification of performance requirements, proposed use, cost and availability of materials, if required, matching the original texture, colour, thickness and opacity of the stained glass
- Equipment suitable for working the chosen material is identified
- Construct/repair the leadlight panel
- Plan is followed to construct/repair the leadlight panel, including any special requirements for historically important works
- Checks are conducted at the identified points
- Modifications are identified and recommended within workplace procedures
- Modifications to the plan are documented and appropriate approvals are sought in accordance with workplace procedures
- Complete work
- Leadlight panel is inspected for quality of work and repaired or reconstructed, as required, in accordance with workplace procedures
- Material which can be re-used is collected and stored
- Waste and scrap material are removed for disposal or recycling, as required
- Work area is cleaned and rubbish disposed of, as appropriate
- Equipment is cleaned and stored according to workplace requirements
- Workplace documentation is completed in accordance with workplace procedures