Elements and Performance Criteria
- Identify work requirements
- Applicable work health and safety (WHS), legislative and organisational requirements relevant to leadlight and stained glass operations are verified and complied with
- Work requirements in the form of type of leadlight and stained glass, frames and the method of fixing are identified, confirmed and clarified with appropriate personnel
- The process for preparing and installing architecturally engineered leadlight and stained glass is identified
- Prepare for installation
- Work sequence is determined in a logical order to suit the job
- Tools, equipment and materials are selected and checked prior to use to ensure they are appropriate for the work, serviceable and in a safe condition
- Components of the leadlight and stained glass are checked against specifications or job order
- Leadlight and stained glass fixing method is selected
- Frame or opening is prepared to receive leadlight and stained glass
- Fixing and sealing materials are prepared by mixing or cutting to length, as appropriate
- Identify site conditions and constraints
- Site safety hazards are recognised and corrective action taken to reduce risk of injury to self and others
- On-site difficulties are identified and addressed in accordance with regulations and enterprise agreements
- Special characteristics of the leadlight and stained glass aperture are identified in relation to the effect of the fitting process on the finished job
- Covering material is applied, where necessary, to protect existing fixtures and fittings
- Fit leadlight and stained glass
- Finalise the installation
- Completed installation is checked to ensure compliance
- Waste and scrap material are removed for disposal or recycling, as required
- Work area is cleaned and rubbish disposed of, as appropriate
- Tools, equipment and unused materials are cleaned, removed and stored appropriately
- Workplace records are maintained according to workplace procedures