Google Links

Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Prepare to classify soil samples
  2. Identify any hazards and relevant safe work procedures associated with the types of site samples
  3. Inspect supplied samples and test data, compare with specifications and record and report any discrepancies
  4. Liaise with client when supplied samples, test data and/or job request forms do not comply with workplace procedures and resolve any problems
  5. Assemble required equipment/materials and check that they are fit for purpose
  6. Examine properties of soil samples
  7. Use moulding/indentation tests, penetrometer and/or density index data to determine soil consistency
  8. Identify the soil’s major, secondary and minor components and the proportion of each
  9. Assign a soil colour based on own observations and review of field log sheets
  10. Determine soil structure based on own observations and review of available zoning, defect and cementing data recorded for undisturbed field samples
  11. Review any additional observations and test data that may identify soil origin
  12. Analyse available test results
  13. Compare particle size and percentage composition data with standard classification values for different soil types
  14. Compare other laboratory test results with own observations to confirm assignment of plasticity, grading and strength of soil samples
  15. Recognise anomalies or unexpected results and, if necessary, recheck specimens and test results and conduct repeat tests to ensure reliable results
  16. Record soil classification
  17. Record and store client’s soil classification, samples and test data in accordance with workplace procedures
  18. Maintain confidentiality of client information in accordance with workplace procedures
  19. Maintain a safe work environment
  20. Clean work area and collect, recycle or dispose of all waste in accordance with workplace procedures
  21. Clean and check serviceability of test equipment before storage