Elements and Performance Criteria
- Prepare the equipment for production
- Conduct equipment pre-start procedures and visual checks
- Set up and configure equipment start-up function in accordance with procedures and/or work instructions
- Ensure appropriate pre-setting period has been observed
- Load mould containing green concrete product onto transfer car and move to steam chamber
- Cover mould as specified
- Close and secure the steam chamber
- Operate and monitor equipment
- Start up, operate and monitor equipment in accordance with established enterprise procedures and manufacturer specifications
- Monitor operating pressures and temperatures
- Ensure the rate at which the concrete temperature increases is even, and that it doesn't exceed maximum temperature specified
- Adjust and control equipment to ensure correct product quality
- Complete appropriate records and logs
- Shut down equipment
- Prepare equipment for maintenance
- Rectify routine problems
- Control hazards