Google Links
Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge
Elements and Performance Criteria
Range Statement
This field allows for different work environments and conditions that may affect performance. Essential operating conditions that may be present (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) are included. |
Regulatory framework | The latest version of all legislation, regulations, industry codes of practice and Australian/international standards, or the version specified by the local regulatory authority, must be used, and include one or more of the following:legislative requirements, including work health and safety (WHS)industry codes of practice and guidelinesenvironmental regulations and guidelines Australian and other standardslicence and certification requirements |
Procedures | All operations must be performed in accordance with relevant procedures.Procedures are written, verbal, visual, computer-based or in some other form, and include one or more of the following:work instructionsstandard operating procedures (SOPs)safe work method statements (SWMS)temporary instructionsany similar instructions provided for the smooth running of the plant |
Tools and equipment | Tools and equipment include one or more of the following:hand toolsspecialised toolsmeasuring and aligning equipment |
Hazards | Hazards include one or more of the following:rotating and moving machineryprocess materials, solids, liquids and gases under pressure or flowinghot surfaces or materialstemporary connections or by-passeselectrical, hydraulic or pneumatic energy sourcesout-of-specification operationother hazards that might arise |
Data and plant records | Observed data and plant records include one or more of the following:plant data log sheetsoperational and performance reportsequipment performance (e.g. speed, output and variations)equipment component performancesequences and timing of operationsmaterials changes (desired and not desired)physical aspects, such as noise, smell, feel and pressure condition monitoring informationplanned maintenance schedulesproceduresmanufacturer specifications, instructions, service manuals and other information |
Performance Evidence
Knowledge Evidence