Google Links

Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Confirm groundwater data requirements with supervisor
  2. Read and interpret available site information, including site plan, bore locations, construction and history of sampling and monitoring
  3. Confirm the sampling methods, locations, numbers and types of samples, and duration and frequency of sampling from workplace or client’s sampling plan
  4. Check that all sampling and testing procedures are in accordance with client or workplace requirements, standards and guidelines
  5. Prepare for groundwater sampling and monitoring
  6. Liaise with relevant personnel to arrange site access and obtain all clearances and permits
  7. Read and interpret field sampling procedures and sample preparation methods required for specific laboratory analyses
  8. Select purging and sampling equipment and sampling conditions to achieve representative samples and preserve sample integrity during collection, storage and transit
  9. Obtain and prepare all reagents, solutions, standards and blanks for field use
  10. Select field test equipment and instruments and check operation and calibration in accordance with methods, procedures and manufacturer instructions
  11. Assemble and stow all sampling equipment, field test equipment, materials, containers and safety equipment
  12. Arrange suitable transport to, from and around site
  13. Establish a well or bore for monitoring purposes
  14. Examine the well or bore area to identify possible hazards
  15. Check proposed drilling and construction method will not cause contamination and that casing, drilling fluids and any other materials used in the bore are free of contaminants
  16. Check powered and non-powered tools and sampling equipment are cleaned thoroughly before drilling commences
  17. Check protective casings and screens are kept in their protective coverings prior to installation
  18. Monitor process to accurately log samples and prevent their contamination
  19. Conduct representative sampling of groundwater
  20. Conduct sufficient measurements to accurately determine water level and bore depth
  21. Record bore and environmental conditions and any atypical observations made during sampling that may impact on sample representativeness or integrity
  22. Conduct purging in accordance with defined procedure or method, collect the waste and decontaminate the equipment used
  23. Collect required representative samples and ensure all controls, blanks and replicate samples are correctly integrated into the sampling process
  24. Record all information and label samples in accordance with chain of custody and traceability requirements
  25. Filter and prepare samples to preserve their integrity for subsequent analysis
  26. Secure and transport all samples back to base in accordance with workplace procedures and guidelines
  27. Conduct field testing of groundwater
  28. Retrieve samples for designated field tests or locate established locations for in-situ testing
  29. Set up, calibrate and operate equipment and instruments in accordance with test methods, procedures and manufacturer instructions
  30. Take sufficient measurements of groundwater field parameters to obtain reliable data and in accordance with specified methods and procedures
  31. Record all field observations and data and transfer accurately to workplace information database
  32. Process and interpret groundwater data
  33. Check calculated values are consistent with expectations
  34. Estimate and document uncertainty of measurements in accordance with workplace procedures
  35. Record and report processed results in accordance with workplace procedures
  36. Interpret trends in data and results and report out-of-specification or atypical results promptly to relevant personnel
  37. Determine if obvious procedure or equipment problems have led to atypical data or results
  38. Compare results with established groundwater quality standards, statutory environmental quality concentration limits
  39. Finalise reporting of results in accordance with workplace requirements
  40. Maintain a safe work environment
  41. Rehabilitate sampling site to render it safe and to minimise environmental impact
  42. Clean and decontaminate all equipment, containers, work area and vehicles according to workplace procedures
  43. Check serviceability of all equipment before storage
  44. Minimise the generation of wastes and environment impacts
  45. Liaise with relevant personnel for the safe collection of all hazardous wastes for appropriate disposal