Google Links
Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge
Elements and Performance Criteria
Range Statement
This field allows for different work environments and conditions that may affect performance. Essential operating conditions that may be present (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) are included. |
Competitive systems and practices include one or more of: | lean operationsagile operationspreventative and predictive maintenance approachesstatistical process control systems, including six sigma and three sigmaJust in Time (JIT), kanban and other pull-related operations control systemssupply, value, and demand chain monitoring and analysis5S continuous improvement (kaizen)breakthrough improvement (kaizen blitz)cause/effect diagramsoverall equipment effectiveness (OEE)takt timeprocess mappingproblem solving run chartsstandard procedurescurrent reality tree. |
Procedures (written, verbal, visual, computer based, etc.) include one or more of: | work instructionsstandard operating procedures (SOPs)safe work method statementsformulas/recipesbatch sheetstemporary instructionsany similar instructions provided for the smooth running of the plant. |
Performance Evidence
Knowledge Evidence