Google Links

Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Identify the system constraint (bottleneck)
  2. Manage capacity constrained resource (drum)
  3. Determine schedule based on capacity constrained resource
  4. Examine operation of system/process

Range Statement

This field allows for different work environments and conditions that may affect performance. Essential operating conditions that may be present (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) are included.

Competitive systems and practices include one or more of:

lean operations

agile operations

preventative and predictive maintenance approaches

statistical process control systems, including six sigma and three sigma

Just in Time (JIT), kanban and other pull-related operations control systems

supply, value, and demand chain monitoring and analysis

5S

continuous improvement (kaizen)

breakthrough improvement (kaizen blitz)

cause/effect diagrams

overall equipment effectiveness (OEE)

takt time

process mapping

problem solving

run charts

standard procedures

current reality tree.



Knowledge Evidence

Must provide evidence that demonstrates knowledge relevant to their job role sufficient to fulfil their job role independently, including:

theory of constraints

concepts of weakest link (often colloquially known as the drum)

duration (in production applications this is often known as material release buffer or inventory to protect the weakest link/constraint)

release timing of buffer (colloquially called ‘rope’)

processes, products, internal and external customers for own work area.