Elements and Performance Criteria
- Prepare for work.
- Prepare for ship transfer
- Transfer product to/from ship.
- Check transfer advice/documentation and complete required records
- Engage fire and deluge protection systems as required
- Launch and retrieve batching pigs as required
- Start pumps to commence the transfer process of the specified product
- Control and monitor transfer rates and take appropriate action
- Monitor the progress of the transfer and tank levels and take appropriate action
- Identify vapour or product leakages/spills and take appropriate action
- Apply emergency procedures as required.
- Complete transfer process.
- Achieve or satisfy capacities and transfer requirements within the allowable timeframes and schedules
- Retrieve batching pigs as required
- Decommission, isolate and disengage transfer pumps and arms/hoses from or to the vessel as required
- Continue to monitor and control fire, deluge and safety systems during the finalisation of the loading process and let-go of the vessel as required
- Complete all required logs and documentation and communicate the results of the transfer to the appropriate personnel
- Shut down and bring transfer facilities off line, ensuring that the area has been made safe after the transfer has been completed.
- Isolate and de-isolate plant.
- Prepare for work