Google Links
Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge
Elements and Performance Criteria
Range Statement
This field allows for different work environments and conditions that may affect performance. Essential operating conditions that may be present (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) are included. |
Regulatory framework | The latest version of all legislation, regulations, industry codes of practice and Australian/international standards, or the version specified by the local regulatory authority, must be used, and include one or more of the following:legislative requirements, including work health and safety (WHS)industry codes of practice and guidelinesenvironmental regulations and guidelines Australian and other standards which may include:AS 2885 (Set) Pipelines - Gas and liquid petroleum AS/NZS 60079 (Set) Explosive atmospheres AS/NZS 1768:2007 Lightning protection AS/NZS 1596:2014 Storage and handling of LP Gas AS 2832.1:2015 Cathodic protection of metals - Pipes and cables AS/NZS 3000:2007 Electrical installations (known as the Australian/New Zealand Wiring Rules)AS 2239-2003 Galvanic (sacrificial) anodes for cathodic protectionutility codes and standards · licence and certification requirements All operations to which this unit applies are subject to stringent health, safety and environment (HSE) requirements, which may be imposed through state/territory or federal legislation, and these must not be compromised at any time. Where there is an apparent conflict between performance criteria and HSE requirements, the HSE requirements take precedence. |
Procedures | All operations must be performed in accordance with relevant procedures.Procedures are written, verbal, visual, computer-based or in some other form, include one or more of the following:emergency procedureswork instructionsstandard operating procedures (SOPs)safe work method statements (SWMS)formulas/recipesbatch sheetstemporary instructionsany similar instructions provided for the smooth running of the plant |
Test equipment | Test equipment will be selected as required from one or more of the following:multimeterchart recordersdata logging equipmentamp and volt meterswatt metershigh voltage testing equipmentearth leakage test equipmentelectrical inspection tags |
Performance Evidence
Knowledge Evidence