Google Links
Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge
Elements and Performance Criteria
Required Skills
Evidence Required
Range Statement
The Range Statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Add any essential operating conditions that may be present with training and assessment depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts.Where reference is made to industry codes of practice, and/or Australian/international standards, the latest version must be used.ContextThis competency applies to the operation of automated resin-glass depositor equipment including moulds, depositor, pumps and controllers.It includes the operation of all relevant additional equipment where that equipment is integral to the process.ProceduresAll operations are performed in accordance with procedures.Procedures include all relevant workplace procedures, work instructions, temporary instructions and relevant industry and government codes and standards. Tools and equipmentThis competency includes use of equipment and tools such as:mouldsresin pumps, fibre feed and fittings, such as hoses and couplings controller, such as PLC if fittedhand tools used in the this processmaterial loading equipment used for loading of raw materials relevant personal protective equipment.HazardsTypical hazards include:spills dusts/vapours slip and fall temperaturehazardous substances moving equipment manual handling hazards.Problems'Respond to routine problems' means 'apply known solutions to a limited range of predictable problems'. Typical process problems may include:equipment malfunctionvariations in process conditionsvariations in materials or contamination of materials equipment, tool or mould damageroutine product faults machine malfunction / failuremould/tooling problems.Typical product problems may include:incorrect quantity of materials/additivescontaminated materials/additivesvariations in materials and/or contamination of materialsresin and fibre over or under supplied to mouldwrong raw materials/additives.Appropriate action for non-routine problems may be reporting to designated person or other action specified in the procedures.