Google Links
Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge
Elements and Performance Criteria
Range Statement
Performance Evidence
Knowledge Evidence
A person competent in this unit must be able to demonstrate knowledge of:
the types, causes and effects of stock preparation system shutdownsrelevant documentation, regulations and procedures to co-ordinate and implement stock preparation system shutdowns, in the pulp and paper industry including:work health and safety (WHS) procedures, including high risk load shifting, licensing requirements, plant clearance, job safety analysis and permit systems Standard Operating Procedures (SOP) and housekeepingsite policy and proceduresenvironmental sustainability requirements/practicesplant manufacturing operating manualsconfined space requirementsvendor documentationreference manual and grade specificationsproductivity requirements and quality proceduresemergency procedures and responsesenterprise policies and procedures and guidelinesoil or chemical spills and disposal guidelinesproduction instructions and plant isolation documentationmaintenance logs, job sheets and operating logsMaterial Safety Data Sheets (MSDS)the functions and operations of plant and machinery related to stock preparation systems including:refinerspumpsvalveschestsagitatorspulpersscreenscleanersshowersdisc deckersconsistency controllersscrew presswater recovery equipmentcomputer systemselectronic screens and alarmsprocess control systems fully automated, semi-automated, manually operated plant and equipment appropriate to stock preparation systemsimplications of hazards and risks involved in stock preparation including:steam and/or gas leaksfiresnip pointscompressed airhot surfaceselectrical entanglementslip hazards/fallsenergy pressureschemicalsfumesconfined spacesdustkey features of stock preparation plant, processes, layout and associated services sufficient to carry out shutdown activities within level of responsibilitymaterials and supplies used in stock preparation systems including water, stock, compressed air, chemicals, additives, steam and baled pulprequired responses to all unplanned shutdowns (power outage, mechanical breakdown, blockages, jamming, air supply, control system failure) to ensure safety, quality and productivitymaintenance systems including operator level maintenance as per site agreements, operator maintenance schedules, maintenance suppliers and pro-active maintenance strategies the operation and application of electronic and other control systems that control the stock preparation systems, within level of responsibility.