Google Links
Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge
Elements and Performance Criteria
Performance Evidence
Evidence is required to be collected that demonstrates a candidate’s competency in this unit. Evidence must be relevant to the roles within this sector’s work operations and satisfy all of the requirements of the performance criteria of this unit and include evidence that the candidate:
locates and applies applicable documentation, policies and proceduresimplements the requirements, procedures and techniques for the safe, effective and efficient completion of sub-soil drainage installation including:accessing, interpreting and applying relevant documentation to the installing sub-soil drainage work activity including relevant drawings and job specifications identifying, addressing and reporting potential hazards and risksidentifying, obtaining, confirming and implementing signage requirements selecting and checking for faults all plant, tools and equipment to carry out tasks identifying, addressing and reporting environmental issues and ground conditionsplanning stock-piling of materials for ease of access and hazard reductionworks effectively with others to undertake and complete the installation of sub-soil drainage in a way that meets all of the required outcomes including:preparing for and organising work activities to meet all task requirementscommunicating clearly and concisely with others to receive and clarify work instructionsusing a range of communication techniques and aids to advise others of work activity and exclusion zonesmonitoring hazards and identifying and communicating changes to the work environment during the work processdemonstrates completion of installing sub-soil drainage that safely, effectively and efficiently meets all of the required outcomes on more than one (1) occasion including:setting out and excavating trenches to the correct location, depth and gradeinstalling sub-soil drainage using specified materials and meeting backfill requirementsclearing work area and recycling or disposing of materials cleaning, checking, maintaining and storing plant, tools and equipmentinstallation of a minimum of one hundred (100) metres of sub-soil drain in two (2) separate locations, including end structures or outlets to design specifications
Knowledge Evidence