Google Links
Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge
Elements and Performance Criteria
Performance Evidence
Evidence is required to be collected that demonstrates a candidate’s competency in this unit. Evidence must be relevant to the roles within this sector’s work operations and satisfy all of the requirements of the performance criteria of this unit and include evidence that the candidate:
locates and applies applicable documentation, policies and proceduresimplements the requirements, procedures and techniques for the safe, effective and efficient completion of placing and forming concrete kerbs, channels and fixtures including:accessing, interpreting and applying documentation relevant to the placing and forming concrete kerb, channel and fixtures identifying and applying relevant drawings and job specifications to all work activitiesidentifying, addressing and reporting potential hazards and risksidentifying, obtaining, confirming and implementing signage requirements selecting and checking for faults all plant, tools and equipment to carry out tasks identifying, addressing and reporting environmental issues and ground conditionsworks effectively with others to undertake and complete the placing and forming of concrete kerbs, channels and fixtures that meets all of the required outcomes including:preparing for and organising work activities to meet all task requirementscommunicating clearly and concisely with others to receive and clarify work instructionsusing a range of communication techniques and aids to advise others of work activity and exclusion zonesmonitoring hazards and identifying and communicating changes to the work environment during the work processdemonstrates completion of place and form concrete kerb, channel and fixtures that safely, effectively and efficiently meets all of the required outcomes on more than one (1) occasion including:setting out and preparing for construction/installation in compliance with drawings and specifications requirementsforming kerb and barrier strips by placing concrete and applying mortar to specifications requirementspouring concrete into installed formwork finishing kerbs, channels and fixturesinstalling pre-cast concrete units and finishing to specificationsrepairing kerb, gutters and median, barrier stripsclearing, backfilling and finishing work areasclearing work area and disposing of, recycling or storing materials
Knowledge Evidence